Survey PhotosOut of water survey is essential, but it's a big headache. There was a wiring problem that had to be addressed before the survey could even be done. One of the previous owners added port side AC electrical hook-ups. The boat has Line 1 and Line 2 AC hook-ups. When they added them, they tied the neutrals of both lines together and ran them through a 3 pole switch instead of a 4 pole switch. The lines had to be re-ran and the switch had to be replaced before the survey could even be done. When the survey was finally done, it went rather well. There were some minor issues that had to be addressed, but the boat is in great shape.